Electricity imports — EE

Dataset documentation and final control (tdc-doc, imported mode)
Open this dataset in OpenData

Abstract. BAFU 2026 v1 (Swiss Federal Office for the Environment). Dataset Electricity imports [EE], per 1 kWh. EF v3.1 climate change 0.1084 kg CO2 eq (Monte Carlo 95 % interval 0.1001–0.1391). Main contributors: Electricity, hard coal, at power plant 28 %; Electricity, peat, at power plant 20 %; Electricity, from natural gas 12 %; Electricity, at cogen 1MWth, wood chips, allocation exergy 5 %; Electricity, hard coal, at power plant 4 %; Electricity, industrial gas, at power plant 4 %. Status: final control passed.
Item Value
Dataset name Electricity imports
Dataset UUID / graph id c63ddb05-f428-3c9a-b1c0-6fffba482599 / activity:electricity_imports__ee
Reference product, unit Electricity imports, 1 kWh
Location EE — Data apply to utilities and auto-producers.
Time period 2023/2023
Category electricity / Electricity imports
Source database BAFU 2026 v1 (Swiss Federal Office for the Environment), version 2026 v1
Publisher Swiss Federal Office for the Environment (FOEN/BAFU)
Background database BAFU 2026 v1 (graph bafuquery-db)
LCIA method EF v3.1, consensus-flow-list implementation, 25 categories (bw2calc on the graph matrix)
Status final control passed
Documented by tdc-doc, imported mode (graph recalculation, Monte Carlo, final control), 2026-11-17

Introduction

Electricity imports in this dataset are representing physical electricity imports as far as such data is available from statistical data sources, in case of data gaps supplemented by trade flow information that also includes physical amounts. Unrealistic values were removed where present. The imported electricity is assumed to reflect the corresponding foreign consumption mix. UUID: c63ddb05-f428-3c9a-b1c0-6fffba482599

This report documents an imported dataset: its inventory and metadata come from the publisher, not from the tdc pipeline. tdc-doc recomputes it on the graph, checks it (Section 7), and reports it in the ISO 14044 / BAFU DQR v2.1 structure used for tdc's own datasets. Sections that only apply to datasets built by tdc (stoichiometry, energy model, literature excerpts) are replaced by what the publisher declares.

Goal and scope

Function, functional unit and reference flow

Reference flow: 1 kWh of Electricity imports (EE). All results are given per unit of the reference flow.

System boundary

Included are the shares of corresponding electricity production by technology and country at the busbar. Not included are transformation, transport or distribution losses.

Technology

No technology description is provided because the dataset just describes the power plant portfolio of the respective country using current average technology per energy carrier.

Native BAFU dataset: exchanges as delivered in EcoSpold v1, linked by the graph migration (graphlca.load).

LCIA method

EF v3.1, characterisation only (no normalisation or weighting), consensus-flow-list implementation of the 25 categories, with regionalised factors where the flow carries a place.

Life cycle inventory

Inventory table

Direct exchanges per reference flow, ordered by their share of climate change. Uncertainty: the distribution declared on the graph edge (BAFU: lognormal from the pedigree matrix). Pedigree: the scores the publisher declares (BAFU: reliability, completeness, temporal, geographical, technological, sample size; PEF DQR otherwise).

Exchange Type Location / compartment Amount Unit Uncertainty Pedigree GWP share (%) Notes
Electricity, hard coal, at power plant technosphere PL 0.027633 kWh lognormal, GSD² 1.11 — 28.2 ██████
Electricity, peat, at power plant technosphere NORDEL 0.018889 kWh lognormal, GSD² 1.11 — 19.6 ████
Electricity, from natural gas technosphere JP 0.02164 kWh lognormal, GSD² 1.11 — 11.6 ██
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 0.095389 kWh lognormal, GSD² 1.11 — 5.5 █
Electricity, hard coal, at power plant technosphere RU 0.0043217 kWh lognormal, GSD² 1.05 — 4.4 █
Electricity, industrial gas, at power plant technosphere DE 0.0039363 kWh lognormal, GSD² 1.11 — 4.3 █
Electricity, hydropower, at reservoir power plant technosphere FI 0.11606 kWh lognormal, GSD² 1.05 — 4.1 █
Electricity, from natural gas technosphere DE 0.0068325 kWh lognormal, GSD² 1.11 — 3.0 █
Electricity, from natural gas technosphere DE 0.006616 kWh lognormal, GSD² 1.11 — 2.9 █
Electricity, lignite, at power plant technosphere PL 0.002647 kWh lognormal, GSD² 1.11 — 2.7 █
Electricity, nuclear, at power plant boiling water reactor technosphere DE 0.21335 kWh lognormal, GSD² 1.11 — 2.0 ·
Electricity, at wind farm technosphere RER 0.14956 kWh lognormal, GSD² 1.05 — 1.9 ·
Electricity, hydropower, at reservoir power plant technosphere FI 0.036108 kWh lognormal, GSD² 1.11 — 1.3 ·
Electricity, hard coal, at power plant technosphere PL 0.001121 kWh lognormal, GSD² 1.05 — 1.1 ·
Electricity, nuclear, at power plant pressure water reactor technosphere DE 0.11959 kWh lognormal, GSD² 1.11 — 1.0 ·
Electricity, oil, at power plant technosphere FI 0.0013726 kWh lognormal, GSD² 1.05 — 0.7 ·
Electricity, at cogen 300kWth, diesel, allocation exergy technosphere CH 9.8984e-04 kWh lognormal, GSD² 1.11 — 0.7 ·
Electricity, lignite, at power plant technosphere PL 4.0501e-04 kWh lognormal, GSD² 1.05 — 0.4 ·
Electricity, at cogen with biogas engine, allocation exergy technosphere CH 0.0024087 kWh lognormal, GSD² 1.11 — 0.4 ·
Electricity, industrial gas, at power plant technosphere DE 3.3932e-04 kWh lognormal, GSD² 1.11 — 0.4 ·
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 0.0041629 kWh lognormal, GSD² 1.11 — 0.2 ·
Electricity, at wind farm technosphere RER 0.017702 kWh lognormal, GSD² 1.05 — 0.2 ·
Electricity, production mix photovoltaic, at plant technosphere FI 0.006659 kWh lognormal, GSD² 1.05 — 0.2 ·
Electricity, from natural gas technosphere DE 4.5217e-04 kWh lognormal, GSD² 1.11 — 0.2 ·
Electricity, hydropower, at reservoir power plant technosphere FI 0.0054694 kWh lognormal, GSD² 1.11 — 0.2 ·
Electricity, from natural gas technosphere DE 3.9916e-04 kWh lognormal, GSD² 1.11 — 0.2 ·
Electricity, at cogen 300kWth, diesel, allocation exergy technosphere CH 2.3755e-04 kWh lognormal, GSD² 1.11 — 0.2 ·
Electricity, nuclear, at power plant boiling water reactor technosphere DE 0.016716 kWh lognormal, GSD² 1.11 — 0.2 ·
Electricity, at cogen with biogas engine, allocation exergy technosphere CH 9.1369e-04 kWh lognormal, GSD² 1.11 — 0.1 ·
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 0.0024052 kWh lognormal, GSD² 1.11 — 0.1 ·
Electricity, hydropower, at run-of-river power plant technosphere RER 0.038868 kWh lognormal, GSD² 1.05 — 0.1 ·
Electricity, industrial gas, at power plant technosphere DE 1.0669e-04 kWh lognormal, GSD² 1.11 — 0.1 ·
Electricity, hydropower, at run-of-river power plant technosphere RER 0.028473 kWh lognormal, GSD² 1.05 — 0.1 ·
Electricity, at cogen 300kWth, diesel, allocation exergy technosphere CH 1.2725e-04 kWh lognormal, GSD² 1.11 — 0.1 ·
Electricity, at cogen 300kWth, diesel, allocation exergy technosphere CH 1.1418e-04 kWh lognormal, GSD² 1.11 — 0.1 ·
Electricity, hydropower, at reservoir power plant technosphere FI 0.0020877 kWh lognormal, GSD² 1.11 — 0.1 ·
Electricity, nuclear, at power plant pressure water reactor technosphere DE 0.0079755 kWh lognormal, GSD² 1.11 — 0.1 ·
Electricity, oil, at power plant technosphere FI 1.1713e-04 kWh lognormal, GSD² 1.11 — 0.1 ·
Electricity, hydropower, at pumped storage power plant technosphere LT 2.6412e-04 kWh lognormal, GSD² 1.05 — 0.1 ·
Electricity, industrial gas, at power plant technosphere DE 5.5769e-05 kWh lognormal, GSD² 1.05 — 0.1 ·
Electricity, lignite, at power plant technosphere DE 5.8465e-05 kWh lognormal, GSD² 1.05 — 0.1 ·
Electricity, nuclear, at power plant pressure water reactor technosphere CN 0.0065538 kWh lognormal, GSD² 1.11 — 0.1 ·
Electricity, from natural gas technosphere DE 1.2555e-04 kWh lognormal, GSD² 1.11 — 0.1 ·
Electricity, oil, at power plant technosphere SK 5.6255e-05 kWh lognormal, GSD² 1.11 — 0.1 ·
Electricity, oil, at power plant technosphere SK 5.3970e-05 kWh lognormal, GSD² 1.11 — 0.1 ·
Electricity, hydropower, at pumped storage power plant technosphere RU 8.2063e-05 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hard coal, at power plant technosphere PL 4.3295e-05 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere SE 0.0013802 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, peat, at power plant technosphere NORDEL 3.6057e-05 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, from natural gas technosphere DE 7.2120e-05 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hard coal, at power plant technosphere NL 3.5479e-05 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hard coal, at power plant technosphere DE 3.2251e-05 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere SE 0.0010267 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, industrial gas, at power plant technosphere DE 2.5138e-05 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at wind farm technosphere RER 0.0019762 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, from natural gas technosphere NL 6.0257e-05 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, nuclear, at power plant boiling water reactor technosphere DE 0.0025984 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen with biogas engine, allocation exergy technosphere CH 1.3980e-04 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at run-of-river power plant technosphere RER 0.0062631 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, oil, at power plant technosphere SE 3.3520e-05 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at wind farm technosphere RER 0.0011371 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, peat, at power plant technosphere NORDEL 1.4181e-05 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 2.4083e-04 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at pumped storage power plant technosphere PL 1.4096e-05 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen with biogas engine, allocation exergy technosphere CH 6.7262e-05 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 1.3037e-04 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at wind farm technosphere RER 5.7688e-04 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, industrial gas, at power plant technosphere NL 5.0777e-06 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at wind farm technosphere RER 5.0031e-04 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere CZ 2.2852e-04 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at wind farm technosphere RER 4.7885e-04 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen 300kWth, diesel, allocation exergy technosphere CH 8.5800e-06 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen with biogas engine, allocation exergy technosphere CH 3.7572e-05 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, from natural gas technosphere NL 1.3329e-05 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen 300kWth, diesel, allocation exergy technosphere CH 7.6305e-06 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen with biogas engine, allocation exergy technosphere CH 2.9559e-05 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, from natural gas technosphere GB 1.0352e-05 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 7.3757e-05 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, oil, at power plant technosphere DE 3.6984e-06 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen 300kWth, diesel, allocation exergy technosphere CH 6.0854e-06 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at pumped storage power plant technosphere NO 5.4827e-05 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at wind farm technosphere RER 3.2249e-04 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at wind farm technosphere RER 2.9859e-04 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, from natural gas technosphere NL 8.3303e-06 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere CN 1.1784e-04 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere CZ 9.5163e-05 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at pumped storage power plant technosphere DE 3.9426e-06 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hard coal, at power plant technosphere NL 2.2163e-06 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, oil, at power plant technosphere DK 2.2939e-06 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hydropower, at run-of-river power plant technosphere RER 5.3286e-04 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen 300kWth, diesel, allocation exergy technosphere CH 2.6227e-06 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere DE 6.1272e-05 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hydropower, at pumped storage power plant technosphere SE 2.7045e-05 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hard coal, at power plant technosphere PL 1.5688e-06 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at run-of-river power plant technosphere RER 3.8859e-04 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen 300kWth, diesel, allocation exergy technosphere CH 1.8748e-06 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere DK 4.5847e-05 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen with biogas engine, allocation exergy technosphere CH 7.7083e-06 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, industrial gas, at power plant technosphere NL 5.5087e-07 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, lignite, at power plant technosphere CZ 6.9207e-07 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 1.1857e-05 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere NO 1.4779e-05 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen 300kWth, diesel, allocation exergy technosphere CH 5.8307e-07 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, peat, at power plant technosphere NORDEL 3.3869e-07 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at pumped storage power plant technosphere LU 7.3177e-07 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere NL 1.1481e-05 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hard coal, at power plant technosphere NL 3.5562e-07 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, from natural gas technosphere BE 5.9081e-07 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at wind farm technosphere RER 1.7596e-05 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, from natural gas technosphere FR 5.1954e-07 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hydropower, at run-of-river power plant technosphere RER 6.2323e-05 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 2.9867e-06 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, industrial gas, at power plant technosphere BE 1.2732e-07 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 2.0952e-06 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at wind farm technosphere RER 9.2887e-06 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen with biogas engine, allocation exergy technosphere CH 7.4646e-07 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, industrial gas, at power plant technosphere NL 8.3722e-08 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 1.8814e-06 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen 300kWth, diesel, allocation exergy technosphere CH 1.5159e-07 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at run-of-river power plant technosphere RER 2.4265e-05 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, from natural gas technosphere GB 1.5614e-07 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 1.0689e-06 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, oil, at power plant technosphere FR 7.6377e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at wind farm technosphere RER 4.1187e-06 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hard coal, at power plant technosphere SK 5.2454e-08 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at pumped storage power plant technosphere GB 2.0458e-07 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, nuclear, at power plant pressure water reactor technosphere FR 7.9564e-06 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, from natural gas technosphere AT 1.0470e-07 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere GB 1.4947e-06 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen with biogas engine, allocation exergy technosphere CH 2.6137e-07 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hard coal, at power plant technosphere CZ 3.2432e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, from natural gas technosphere AT 8.2649e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hydropower, at reservoir power plant technosphere CH 4.5870e-06 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hard coal, at power plant technosphere BE 3.5819e-08 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at wind farm technosphere RER 2.6929e-06 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, nuclear, at power plant pressure water reactor technosphere DE 3.6072e-06 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen 300kWth, diesel, allocation exergy technosphere CH 4.5403e-08 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, oil, at power plant technosphere GB 2.6270e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, nuclear, at power plant pressure water reactor technosphere FR 4.1931e-06 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, nuclear, at power plant pressure water reactor technosphere DE 2.8306e-06 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, oil, at power plant technosphere SE 4.0070e-08 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, from natural gas technosphere LU 4.2115e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hard coal, at power plant technosphere FR 1.8887e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, industrial gas, at power plant technosphere FR 1.5288e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hydropower, at pumped storage power plant technosphere BE 8.2561e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hydropower, at pumped storage power plant technosphere CZ 2.5607e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, from natural gas technosphere AT 3.2434e-08 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, nuclear, at power plant pressure water reactor technosphere DE 1.5648e-06 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, lignite, at power plant technosphere SK 1.0383e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hydropower, at pumped storage power plant technosphere AT 5.0229e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hydropower, at reservoir power plant technosphere CH 1.4899e-06 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, from natural gas technosphere AT 2.6272e-08 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen with biogas engine, allocation exergy technosphere CH 6.7124e-08 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, industrial gas, at power plant technosphere AT 1.1989e-08 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere FR 3.5287e-07 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, industrial gas, at power plant technosphere AT 1.1234e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, from natural gas technosphere IT 2.0619e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen with biogas engine, allocation exergy technosphere CH 5.6318e-08 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen with biogas engine, allocation exergy technosphere CH 5.4476e-08 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, industrial gas, at power plant technosphere AT 9.1599e-09 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere BE 2.4573e-07 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, from natural gas technosphere ES 1.3392e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen with biogas engine, allocation exergy technosphere CH 4.3840e-08 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at pumped storage power plant technosphere CH 5.7545e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 1.0961e-07 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 1.0177e-07 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, nuclear, at power plant pressure water reactor technosphere DE 6.4625e-07 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, oil, at power plant technosphere NL 7.6395e-09 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, peat, at power plant technosphere NORDEL 5.1908e-09 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at pumped storage power plant technosphere FR 6.0468e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hard coal, at power plant technosphere SK 4.6636e-09 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 7.4995e-08 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at run-of-river power plant technosphere RER 1.2095e-06 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen with biogas engine, allocation exergy technosphere CH 2.4851e-08 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at wind farm technosphere RER 2.9191e-07 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, oil, at power plant technosphere SK 3.9591e-09 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, oil, at power plant technosphere AT 3.6303e-09 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 5.1071e-08 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at reservoir power plant technosphere CH 3.4216e-07 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at wind farm technosphere RER 2.0371e-07 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hard coal, at power plant technosphere BE 2.2923e-09 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, nuclear, at power plant pressure water reactor technosphere DE 2.4525e-07 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere CZ 7.5582e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hydropower, at run-of-river power plant technosphere RER 5.9331e-07 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hydropower, at reservoir power plant technosphere CH 2.4557e-07 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, industrial gas, at power plant technosphere AT 2.3157e-09 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hard coal, at power plant technosphere IT 1.6021e-09 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, lignite, at power plant technosphere HU 1.4679e-09 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere LU 5.1909e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, from natural gas technosphere AT 3.1004e-09 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen 300kWth, natural gas, allocation exergy technosphere CH 2.4696e-09 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at pumped storage power plant technosphere UA 3.6478e-09 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hydropower, at pumped storage power plant technosphere IE 2.5732e-09 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, nuclear, at power plant pressure water reactor technosphere CH 9.4980e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, lignite, at power plant technosphere SI 1.3027e-09 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, lignite, at power plant technosphere RS 1.0548e-09 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen 300kWth, diesel, allocation exergy technosphere CH 1.6029e-09 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, nuclear, at power plant pressure water reactor technosphere DE 1.2502e-07 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at pumped storage power plant technosphere SK 3.4832e-09 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 1.8512e-08 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, oil, at power plant technosphere ES 1.0762e-09 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen 300kWth, diesel, allocation exergy technosphere CH 1.5092e-09 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hard coal, at power plant technosphere ES 9.5491e-10 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hydropower, at run-of-river power plant technosphere RER 2.9168e-07 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, nuclear, at power plant boiling water reactor technosphere CH 6.9203e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 1.5823e-08 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, lignite, at power plant technosphere BA 6.8637e-10 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere AT 3.2831e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hydropower, at run-of-river power plant technosphere RER 2.3593e-07 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen with biogas engine, allocation exergy technosphere CH 5.1789e-09 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, lignite, at power plant technosphere RS 6.6706e-10 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere CH 2.6206e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen 300kWth, diesel, allocation exergy technosphere CH 1.0107e-09 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at wind farm technosphere RER 4.8053e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere HU 2.3257e-08 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen with biogas engine, allocation exergy technosphere CH 3.6041e-09 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen 300kWth, diesel, allocation exergy technosphere CH 7.8233e-10 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, industrial gas, at power plant technosphere IT 3.7352e-10 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, oil, at power plant technosphere IE 5.4875e-10 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen with biogas engine, allocation exergy technosphere CH 2.7069e-09 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at run-of-river power plant technosphere CH 1.2440e-07 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hydropower, at pumped storage power plant technosphere ES 1.6297e-09 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 6.0657e-09 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, lignite, at power plant technosphere MK 3.0320e-10 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, from natural gas technosphere AT 7.2929e-10 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere IT 1.6311e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hydropower, at reservoir power plant technosphere CH 3.9787e-08 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, oil, at power plant technosphere IT 3.4611e-10 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, industrial gas, at power plant technosphere ES 2.9584e-10 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at wind farm technosphere RER 2.2416e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere ES 1.5527e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere HU 1.1068e-08 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at run-of-river power plant technosphere RER 7.6938e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen with biogas engine, agricultural covered, alloc. exergy technosphere CH 1.8420e-09 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hydropower, at reservoir power plant technosphere CH 3.0709e-08 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen 300kWth, biomethane, allocation exergy technosphere CH 8.4847e-10 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere IE 7.2147e-09 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, oil, at power plant technosphere SK 2.5108e-10 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere HU 9.5926e-09 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hydropower, at reservoir power plant technosphere CH 2.8231e-08 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 3.8172e-09 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, from natural gas technosphere AT 4.8101e-10 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen with biogas engine, allocation exergy technosphere CH 1.3934e-09 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at reservoir power plant technosphere CH 2.5788e-08 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at run-of-river power plant technosphere RER 5.8873e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at wind farm technosphere RER 1.4497e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen 300kWth, diesel, allocation exergy technosphere CH 2.6680e-10 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hard coal, at power plant technosphere HR 1.8522e-10 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen with biogas engine, allocation exergy technosphere CH 1.0452e-09 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at run-of-river power plant technosphere RER 4.5437e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen 300kWth, diesel, allocation exergy technosphere CH 2.0790e-10 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, oil, at power plant technosphere CZ 1.1395e-10 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at wind farm technosphere RER 9.8792e-09 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hard coal, at power plant technosphere AT 1.5457e-10 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, from natural gas technosphere AT 2.6057e-10 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hard coal, at power plant technosphere PT 1.1216e-10 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen 300kWth, diesel, allocation exergy technosphere CH 1.4848e-10 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at pumped storage power plant technosphere IT 2.5410e-10 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hard coal, at power plant technosphere AT 1.2554e-10 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, nuclear, at power plant pressure water reactor technosphere FR 1.6217e-08 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, from natural gas technosphere ES 1.8001e-10 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at run-of-river power plant technosphere RER 2.7098e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hydropower, at reservoir power plant technosphere CH 1.0276e-08 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at run-of-river power plant technosphere RER 2.2367e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hydropower, at run-of-river power plant technosphere RER 2.2321e-08 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 1.1147e-09 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, nuclear, at power plant pressure water reactor technosphere DE 7.2709e-09 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen 300kWth, diesel, allocation exergy technosphere CH 9.0225e-11 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 1.0248e-09 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at pumped storage power plant technosphere PT 2.4389e-10 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, oil, at power plant technosphere BE 5.4481e-11 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen 300kWth, diesel, allocation exergy technosphere CH 7.2294e-11 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, lignite, at power plant technosphere GR 4.2962e-11 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, from natural gas technosphere IT 9.1014e-11 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, oil, at power plant technosphere PT 4.3568e-11 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, nuclear, at power plant boiling water reactor technosphere CH 2.8081e-09 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen with biogas engine, allocation exergy technosphere CH 2.4586e-10 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen 300kWth, diesel, allocation exergy technosphere CH 5.4633e-11 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 6.5210e-10 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at reservoir power plant technosphere CH 4.3087e-09 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at pumped storage power plant technosphere SI 1.0714e-10 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at wind farm technosphere RER 2.4866e-09 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, peat, at power plant technosphere NORDEL 3.0175e-11 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at run-of-river power plant technosphere RER 8.9065e-09 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, from natural gas technosphere IT 6.4177e-11 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, industrial gas, at power plant technosphere AT 3.1114e-11 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen with biogas engine, allocation exergy technosphere CH 1.6969e-10 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, nuclear, at power plant pressure water reactor technosphere CH 2.0002e-09 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at pumped storage power plant technosphere RS 2.4148e-11 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hard coal, at power plant technosphere SK 2.4742e-11 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 3.5126e-10 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, from natural gas technosphere IT 4.1182e-11 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere AT 7.1397e-10 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at wind farm technosphere CH 1.1469e-09 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hard coal, at power plant technosphere SK 1.7324e-11 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at pumped storage power plant technosphere HR 3.6996e-11 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, industrial gas, at power plant technosphere IT 1.0517e-11 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, oil, at power plant technosphere HR 1.3110e-11 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hydropower, at run-of-river power plant technosphere RER 3.6888e-09 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, oil, at power plant technosphere GR 1.2406e-11 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hydropower, at reservoir power plant technosphere CH 1.3531e-09 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hard coal, at power plant technosphere HR 1.0668e-11 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at pumped storage power plant technosphere RO 2.9604e-11 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, from natural gas technosphere ES 1.7598e-11 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, industrial gas, at power plant technosphere AT 1.0018e-11 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere HU 3.3753e-10 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at wind farm technosphere RER 6.2553e-10 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hydropower, at run-of-river power plant technosphere RER 2.3271e-09 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hydropower, at reservoir power plant technosphere CH 9.7041e-10 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, nuclear, at power plant pressure water reactor technosphere DE 8.6311e-10 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hard coal, at power plant technosphere SK 7.0539e-12 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at wind farm technosphere RER 5.3353e-10 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, oil, at power plant technosphere PT 7.4622e-12 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, nuclear, at power plant pressure water reactor technosphere CH 5.2918e-10 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen 300kWth, diesel, allocation exergy technosphere CH 9.6786e-12 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 1.1260e-10 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at reservoir power plant technosphere CH 7.4395e-10 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at pumped storage power plant technosphere BA 4.9119e-12 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen with biogas engine, allocation exergy technosphere CH 3.6138e-11 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, lignite, at power plant technosphere GR 3.8314e-12 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at wind farm technosphere RER 3.4185e-10 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen with biogas engine, allocation exergy technosphere CH 2.8260e-11 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at wind farm technosphere RER 3.3518e-10 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen 300kWth, diesel, allocation exergy technosphere CH 6.1375e-12 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen 300kWth, diesel, allocation exergy technosphere CH 6.1357e-12 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, from natural gas technosphere IT 9.0586e-12 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 7.0680e-11 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at run-of-river power plant technosphere RER 1.1447e-09 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hydropower, at reservoir power plant technosphere CH 4.6906e-10 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen 300kWth, diesel, allocation exergy technosphere CH 5.2770e-12 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, oil, at power plant technosphere HR 3.6755e-12 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 5.6863e-11 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at reservoir power plant technosphere CH 3.9792e-10 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, industrial gas, at power plant technosphere IT 2.4283e-12 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, lignite, at power plant technosphere MK 2.8486e-12 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, from natural gas technosphere IT 6.8079e-12 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at pumped storage power plant technosphere BG 3.9380e-12 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere GR 1.4118e-10 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, oil, at power plant technosphere GR 2.7669e-12 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at run-of-river power plant technosphere RER 7.0783e-10 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere GR 1.1244e-10 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 3.7339e-11 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at run-of-river power plant technosphere RER 6.0342e-10 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere HU 6.4981e-11 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, oil, at power plant technosphere HU 1.7599e-12 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen with biogas engine, allocation exergy technosphere CH 9.6619e-12 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at pumped storage power plant technosphere MA 1.4795e-12 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen with biogas engine, allocation exergy technosphere CH 8.6287e-12 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 2.1683e-11 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at run-of-river power plant technosphere RER 3.5221e-10 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 1.9312e-11 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at wind farm technosphere RER 8.0557e-11 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at wind farm technosphere RER 7.9543e-11 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere PT 5.0994e-11 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hydropower, at pumped storage power plant technosphere GR 1.6546e-12 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen with biogas engine, allocation exergy technosphere CH 4.1824e-12 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at wind farm technosphere RER 4.8978e-11 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hydropower, at reservoir power plant technosphere CH 7.6107e-11 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at wind farm technosphere RER 4.5342e-11 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen with biogas engine, allocation exergy technosphere CH 3.6240e-12 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere HU 1.9923e-11 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere HU 1.9244e-11 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, oil, at power plant technosphere HR 4.2083e-13 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at wind farm technosphere RER 2.9984e-11 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hydropower, at reservoir power plant technosphere CH 4.3806e-11 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at wind farm technosphere RER 2.7042e-11 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at run-of-river power plant technosphere RER 7.4251e-11 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen with biogas engine, allocation exergy technosphere CH 1.6003e-12 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, industrial gas, at power plant technosphere IT 1.6574e-13 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at run-of-river power plant technosphere RER 6.3210e-11 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere PT 8.7207e-12 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen 300kWth, diesel, allocation exergy technosphere CH 2.2563e-13 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, from natural gas technosphere IT 3.1300e-13 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, oil, at power plant technosphere HU 1.4358e-13 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hydropower, at run-of-river power plant technosphere RER 3.4516e-11 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, oil, at power plant technosphere GR 1.2090e-13 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at run-of-river power plant technosphere RER 3.1240e-11 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hydropower, at reservoir power plant technosphere CH 1.1998e-11 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen with biogas engine, allocation exergy technosphere CH 4.3338e-13 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen 300kWth, diesel, allocation exergy technosphere CH 9.3528e-14 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at wind farm technosphere RER 3.4194e-12 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 6.9544e-13 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere TR 2.1105e-12 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at wind farm technosphere RER 2.5877e-12 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, hydropower, at reservoir power plant technosphere CH 3.1402e-12 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, oil, at power plant technosphere GR 2.3603e-14 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 3.1034e-13 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen with biogas engine, allocation exergy technosphere CH 7.1271e-14 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at run-of-river power plant technosphere RER 3.1402e-12 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen 1MWth, wood chips, allocation exergy technosphere CH 1.6384e-13 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at reservoir power plant technosphere CH 1.0658e-12 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, production mix photovoltaic, at plant technosphere GR 3.8333e-13 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at run-of-river power plant technosphere RER 1.0658e-12 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, hydropower, at reservoir power plant technosphere CH 4.1676e-13 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at wind farm technosphere RER 1.9684e-13 kWh lognormal, GSD² 1.05 — 0.0 ·
Electricity, at cogen 300kWth, diesel, allocation exergy technosphere CH 1.7035e-15 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity, at cogen 300kWth, diesel, allocation exergy technosphere CH 2.0399e-16 kWh lognormal, GSD² 1.11 — 0.0 ·
Electricity from waste, at municipal waste incineration plant technosphere CH 0.0082692 kWh lognormal, GSD² 1.11 — -0.0 ·
Electricity from waste, at municipal waste incineration plant technosphere CH 0.0022439 kWh lognormal, GSD² 1.11 — -0.0 ·
Electricity from waste, at municipal waste incineration plant technosphere CH 3.1996e-04 kWh lognormal, GSD² 1.11 — -0.0 ·
Electricity from waste, at municipal waste incineration plant technosphere CH 1.5640e-04 kWh lognormal, GSD² 1.11 — -0.0 ·
Electricity from waste, at municipal waste incineration plant technosphere CH 2.1922e-05 kWh lognormal, GSD² 1.11 — -0.0 ·
Electricity from waste, at municipal waste incineration plant technosphere CH 1.5686e-05 kWh lognormal, GSD² 1.11 — -0.0 ·
Electricity from waste, at municipal waste incineration plant technosphere CH 1.4752e-05 kWh lognormal, GSD² 1.11 — -0.0 ·
Electricity from waste, at municipal waste incineration plant technosphere CH 1.3450e-05 kWh lognormal, GSD² 1.11 — -0.0 ·
Electricity from waste, at municipal waste incineration plant technosphere CH 1.5269e-06 kWh lognormal, GSD² 1.11 — -0.0 ·
Electricity from waste, at municipal waste incineration plant technosphere CH 9.7408e-07 kWh lognormal, GSD² 1.11 — -0.0 ·
Electricity from waste, at municipal waste incineration plant technosphere CH 1.8854e-07 kWh lognormal, GSD² 1.11 — -0.0 ·
Electricity from waste, at municipal waste incineration plant technosphere CH 8.3550e-08 kWh lognormal, GSD² 1.11 — -0.0 ·
Electricity from waste, at municipal waste incineration plant technosphere CH 1.4843e-08 kWh lognormal, GSD² 1.05 — -0.0 ·
Electricity from waste, at municipal waste incineration plant technosphere CH 1.1588e-08 kWh lognormal, GSD² 1.11 — -0.0 ·
Electricity from waste, at municipal waste incineration plant technosphere CH 6.8945e-09 kWh lognormal, GSD² 1.11 — -0.0 ·
Electricity from waste, at municipal waste incineration plant technosphere CH 6.0691e-09 kWh lognormal, GSD² 1.11 — -0.0 ·
Electricity from waste, at municipal waste incineration plant technosphere CH 5.5656e-09 kWh lognormal, GSD² 1.11 — -0.0 ·
Electricity from waste, at municipal waste incineration plant technosphere CH 3.3476e-09 kWh lognormal, GSD² 1.11 — -0.0 ·
Electricity from waste, at municipal waste incineration plant technosphere CH 1.1019e-09 kWh lognormal, GSD² 1.11 — -0.0 ·
Electricity from waste, at municipal waste incineration plant technosphere CH 5.1075e-10 kWh lognormal, GSD² 1.11 — -0.0 ·
Electricity from waste, at municipal waste incineration plant technosphere CH 2.6959e-10 kWh lognormal, GSD² 1.11 — -0.0 ·
Electricity from waste, at municipal waste incineration plant technosphere CH 1.6135e-11 kWh lognormal, GSD² 1.11 — -0.0 ·
Electricity from waste, at municipal waste incineration plant technosphere CH 4.8921e-12 kWh lognormal, GSD² 1.11 — -0.0 ·
Electricity from waste, at municipal waste incineration plant technosphere CH 3.7914e-12 kWh lognormal, GSD² 1.11 — -0.0 ·
Electricity from waste, at municipal waste incineration plant technosphere CH 2.5928e-13 kWh lognormal, GSD² 1.11 — -0.0 ·
Electricity from waste, at municipal waste incineration plant technosphere CH 1.7415e-13 kWh lognormal, GSD² 1.11 — -0.0 ·
Electricity from waste, at municipal waste incineration plant technosphere CH 6.5830e-14 kWh lognormal, GSD² 1.11 — -0.0 ·

Data quality

0 of 424 direct exchanges carry a declared pedigree, 424 carry a distribution.

Field As declared by the publisher
Data generator / entry / validation data generator: Christopher Oberschelp (ETH); data entry: Christopher Oberschelp (ETH); validation (proof reading): René Itten (ZHAW)
sampling procedure Statistical data
uncertainty adjustments none
validation details manual review of spold files and documentation
time period comment Time period of statistics used.

Data gaps, proxies and assumptions

None recorded.

Life cycle impact assessment (EF v3.1)

Per 1 kWh. The 95 % interval and GSD² come from the Monte Carlo of Section 6.4.

Impact category Indicator Unit Result 2.5 % 97.5 % GSD²
Acidification Accumulated Exceedance (AE) mol H+ eq 2.706e-04 2.552e-04 4.294e-04 1.29
Climate change-Biogenic Radiative forcing as Global Warming Potential (GWP100) kg CO2 eq 0.006708 0.002665 0.0193 2.77
Climate change-Fossil Radiative forcing as Global Warming Potential (GWP100) kg CO2 eq 0.1017 0.09315 0.1293 1.18
Climate change-Land use and land use change Radiative forcing as Global Warming Potential (GWP100) kg CO2 eq 1.346e-05 1.189e-05 2.278e-05 1.39
Climate change Radiative forcing as Global Warming Potential (GWP100) kg CO2 eq 0.1084 0.1001 0.1391 1.18
EF-particulate Matter Impact on human health disease incidence 6.509e-09 5.043e-09 1.170e-08 1.54
Ecotoxicity, freshwater_inorganics Comparative Toxic Unit for ecosystems (CTUe) CTUe 0.3668 0.2786 1.089 2.01
Ecotoxicity, freshwater_organics Comparative Toxic Unit for ecosystems (CTUe) CTUe 0.007138 0.005142 0.02544 2.25
Ecotoxicity, freshwater Comparative Toxic Unit for ecosystems (CTUe) CTUe 0.3739 0.2844 1.12 2.01
Eutrophication marine Fraction of nutrients reaching marine end compartment (N) kg N eq 1.181e-04 1.042e-04 2.021e-04 1.38
Eutrophication, freshwater Fraction of nutrients reaching freshwater end compartment (P) kg P eq 2.948e-05 1.886e-05 1.008e-04 2.38
Eutrophication, terrestrial Accumulated Exceedance (AE) mol N eq 9.785e-04 8.445e-04 0.00187 1.45
Human toxicity, cancer_inorganics Comparative Toxic Unit for human (CTUh) CTUh 1.635e-11 1.618e-11 4.891e-11 1.79
Human toxicity, cancer_organics Comparative Toxic Unit for human (CTUh) CTUh 1.914e-10 1.243e-10 3.205e-10 1.62
Human toxicity, cancer Comparative Toxic Unit for human (CTUh) CTUh 2.077e-10 1.487e-10 3.494e-10 1.54
Human toxicity, non-cancer_inorganics Comparative Toxic Unit for human (CTUh) CTUh 1.184e-09 1.057e-09 3.678e-09 1.86
Human toxicity, non-cancer_organics Comparative Toxic Unit for human (CTUh) CTUh 4.210e-11 3.647e-11 7.433e-11 1.45
Human toxicity, non-cancer Comparative Toxic Unit for human (CTUh) CTUh 1.226e-09 1.101e-09 3.725e-09 1.83
Ionising radiation, human health Human exposure efficiency relative to U235 kBq U235 eq 0.4736 0.1271 2.959 5.18
Land use Soil quality index pt (soil quality index) 8.141 4.89 14.09 1.72
Ozone depletion Ozone Depletion Potential (ODP) kg CFC-11 eq 1.153e-08 6.599e-09 2.456e-08 1.93
Photochemical ozone formation - human health Tropospheric ozone concentration increase kg NMVOC eq 3.310e-04 2.960e-04 5.714e-04 1.39
Resource use, fossils Abiotic resource depletion fossil fuels (ADP-fossil) MJ 5.717 4.86 7.627 1.27
Resource use, minerals and metals Abiotic resource depletion (ADP ultimate reserve) kg Sb eq 1.313e-07 1.236e-07 2.422e-07 1.43
Water use User deprivation potential (deprivation-weighted water consumption) m3 world eq deprived 0.05922 -204.5 108 —

Climate change 0.1084 kg CO2 eq per kWh. Main contributors: Electricity, hard coal, at power plant 28 %; Electricity, peat, at power plant 20 %; Electricity, from natural gas 12 %; Electricity, at cogen 1MWth, wood chips, allocation exergy 5 %; Electricity, hard coal, at power plant 4 %; Electricity, industrial gas, at power plant 4 %.

Interpretation

Significant issues

Direct exchanges dominating climate change: Electricity, hard coal, at power plant 28 %; Electricity, peat, at power plant 20 %; Electricity, from natural gas 12 %; Electricity, at cogen 1MWth, wood chips, allocation exergy 5 %; Electricity, hard coal, at power plant 4 %; Electricity, industrial gas, at power plant 4 %. Most sensitive exchanges (Section 6.3): Electricity, hard coal, at power plant [PL] (-2.8 / +3.1 %); Electricity, peat, at power plant [NORDEL] (-2.0 / +2.2 %); Electricity, from natural gas [JP] (-1.2 / +1.3 %).

Independent recalculation

Graph result against BAFU 2026 v1 published EF 3.1 results (LCIA Results.xlsx, June 2026) — published per MJ, converted ×3.6 to per kWh:

Category Graph Published Graph / published
Acidification 2.706e-04 3.957e-04 0.684
Climate change-Biogenic 0.006708 0.006708 1.000
Climate change-Fossil 0.1017 0.1017 1.000
Climate change-Land use and land use change 1.346e-05 1.346e-05 1.000
Climate change 0.1084 0.1084 1.000
EF-particulate Matter 6.509e-09 6.509e-09 1.000
Ecotoxicity, freshwater_inorganics 0.3668 0.3881 0.945
Ecotoxicity, freshwater_organics 0.007138 0.007033 1.015
Ecotoxicity, freshwater 0.3739 0.395 0.947
Eutrophication marine 1.181e-04 1.180e-04 1.001
Eutrophication, freshwater 2.948e-05 2.948e-05 1.000
Eutrophication, terrestrial 9.785e-04 0.001141 0.858
Human toxicity, cancer_inorganics 1.635e-11 1.468e-11 1.114
Human toxicity, cancer_organics 1.914e-10 1.914e-10 1.000
Human toxicity, cancer 2.077e-10 2.061e-10 1.008
Human toxicity, non-cancer_inorganics 1.184e-09 1.118e-09 1.059
Human toxicity, non-cancer_organics 4.210e-11 4.209e-11 1.000
Human toxicity, non-cancer 1.226e-09 1.160e-09 1.057
Ionising radiation, human health 0.4736 0.4736 1.000
Land use 8.141 6.504 1.252
Ozone depletion 1.153e-08 1.153e-08 1.000
Photochemical ozone formation - human health 3.310e-04 3.310e-04 1.000
Resource use, fossils 5.717 5.934 0.963
Resource use, minerals and metals 1.313e-07 1.233e-07 1.065
Water use 0.05922 0.0658 0.900
Over all BAFU datasets, climate change agrees with the published table for 98.1 % of them within ±5 % (median ×1.000). Systematic differences are expected where the graph characterises differently from BAFU's table: regionalised factors (acidification, terrestrial eutrophication, land use, water use, by the flow's place) and the metal resource factors; these categories: Acidification median ×0.81 (16 % within ±5 %); Eutrophication, terrestrial median ×0.93 (37 % within ±5 %); Land use median ×1.23 (6 % within ±5 %); Resource use, minerals and metals median ×1.04 (52 % within ±5 %); Water use median ×0.75 (11 % within ±5 %). BAFU's table is per its own unit (electricity per MJ, cars per m, crops per m2), converted here, and carries the organics and inorganics sub-indicators of freshwater ecotoxicity in each other's column (primary copper: 99.7 % of its ecotoxicity under 'organics'); they are compared like with like.
Also published by BAFU for this dataset: IPCC 2021 GWP100 0.1084 kg CO2 eq; Ecological Scarcity
2021 total 359.4 UBP.

Sensitivity check

One at a time on each direct exchange, over its declared 95 % range (±50 % when none is declared, the tdc-doc default for an assumption without a range). The supply chain behind each input is held at its mean.

Exchange Base Low / high Range Δ GWP100 (%) Δ other categories (max %)
Electricity, hard coal, at power plant [PL] 0.02763 kWh ×0.9 / ×1.11 lognormal, GSD² 1.11 -2.8 / +3.1 4.2 (Human toxicity, non-cancer_inorganics)
Electricity, peat, at power plant [NORDEL] 0.01889 kWh ×0.9 / ×1.11 lognormal, GSD² 1.11 -2.0 / +2.2 2.8 (Acidification)
Electricity, from natural gas [JP] 0.02164 kWh ×0.9 / ×1.11 lognormal, GSD² 1.11 -1.2 / +1.3 4.6 (Ecotoxicity, freshwater_organics)
Electricity, at cogen 1MWth, wood chips, allocation exergy [CH] 0.09539 kWh ×0.9 / ×1.11 lognormal, GSD² 1.11 -0.5 / +0.6 10.3 (Land use)
Electricity, industrial gas, at power plant [DE] 0.003936 kWh ×0.9 / ×1.11 lognormal, GSD² 1.11 -0.4 / +0.5 1.1 (Human toxicity, cancer_organics)
Electricity, from natural gas [DE] 0.006833 kWh ×0.9 / ×1.11 lognormal, GSD² 1.11 -0.3 / +0.3 0.4 (Climate change-Fossil)
Electricity, from natural gas [DE] 0.006616 kWh ×0.9 / ×1.11 lognormal, GSD² 1.11 -0.3 / +0.3 0.3 (Climate change-Fossil)
Electricity, lignite, at power plant [PL] 0.002647 kWh ×0.9 / ×1.11 lognormal, GSD² 1.11 -0.3 / +0.3 2.8 (Eutrophication, freshwater)
Electricity, nuclear, at power plant boiling water reactor [DE] 0.2134 kWh ×0.9 / ×1.11 lognormal, GSD² 1.11 -0.2 / +0.2 6.6 (Ionising radiation, human health)
Electricity, hard coal, at power plant [RU] 0.004322 kWh ×0.953 / ×1.05 lognormal, GSD² 1.05 -0.2 / +0.2 0.6 (Eutrophication, freshwater)
Electricity, hydropower, at reservoir power plant [FI] 0.1161 kWh ×0.953 / ×1.05 lognormal, GSD² 1.05 -0.2 / +0.2 3.3 (Climate change-Biogenic)
Electricity, hydropower, at reservoir power plant [FI] 0.03611 kWh ×0.9 / ×1.11 lognormal, GSD² 1.11 -0.1 / +0.1 2.3 (Climate change-Biogenic)
Electricity, nuclear, at power plant pressure water reactor [DE] 0.1196 kWh ×0.9 / ×1.11 lognormal, GSD² 1.11 -0.1 / +0.1 3.4 (Ionising radiation, human health)
Electricity, at wind farm [RER] 0.1496 kWh ×0.952 / ×1.05 lognormal, GSD² 1.05 -0.1 / +0.1 1.8 (Resource use, minerals and metals)
Electricity, at cogen 300kWth, diesel, allocation exergy [CH] 9.898e-04 kWh ×0.9 / ×1.11 lognormal, GSD² 1.11 -0.1 / +0.1 0.7 (Human toxicity, cancer_organics)

Uncertainty analysis

Monte Carlo over the whole supply chain: 1000 draws (seed 42, computed 2026-11-17), every exchange of the database that carries a distribution resampled at each draw, one adjoint solve per category per draw. Exchanges without a distribution enter as fixed values (Section 4.3). Results in Section 5.

Comparison with other data

Source Scope Value This dataset Ratio Note
bafu Electricity imports [AR] 0.08781 kg CO2 eq 0.1084 1.23 same dataset name, other location
bafu Electricity imports [SE] 0.09689 kg CO2 eq 0.1084 1.12 same dataset name, other location
bafu Electricity imports [NO] 0.1095 kg CO2 eq 0.1084 0.99 same dataset name, other location
bafu Electricity imports [ES] 0.1131 kg CO2 eq 0.1084 0.96 same dataset name, other location
bafu Electricity imports [IT] 0.117 kg CO2 eq 0.1084 0.93 same dataset name, other location
bafu Electricity imports [SK] 0.5444 kg CO2 eq 0.1084 0.20 same dataset name, other location
bafu Electricity imports [MY] 0.5889 kg CO2 eq 0.1084 0.18 same dataset name, other location
bafu Electricity imports [VN] 0.6978 kg CO2 eq 0.1084 0.16 same dataset name, other location
bafu Electricity imports [ID] 0.7298 kg CO2 eq 0.1084 0.15 same dataset name, other location
bafu Electricity imports [TH] 0.7298 kg CO2 eq 0.1084 0.15 same dataset name, other location

Conclusions and limitations

GWP100 0.1084 kg CO2 eq per kWh (95 % interval 0.1001–0.1391). Dominant contributors: Electricity, hard coal, at power plant 28 %; Electricity, peat, at power plant 20 %; Electricity, from natural gas 12 %; Electricity, at cogen 1MWth, wood chips, allocation exergy 5 %; Electricity, hard coal, at power plant 4 %; Electricity, industrial gas, at power plant 4 %. Most sensitive: Electricity, hard coal, at power plant [PL] (-2.8 / +3.1 %); Electricity, peat, at power plant [NORDEL] (-2.0 / +2.2 %); Electricity, from natural gas [JP] (-1.2 / +1.3 %). final control passed. The documentation relies on the publisher's metadata; this report is not a critical review in the sense of ISO 14044 clause 6.

Final control

Item Status Detail
reference flow PASS production amount 1.0 kWh
closure: sum of direct contributions = dataset score (all 25 categories) PASS largest relative gap 1.7e-15
independent recalculation vs BAFU 2026 v1 published EF 3.1 results (LCIA Results.xlsx, June 2026) — published per MJ, converted ×3.6 to per kWh (climate change) PASS graph / published = 1; categories within ±5 %: 15/25
every technosphere input of the EcoSpold delivery is in the graph PASS all present (bafu_links_check.py)
uncertainty declared on the direct exchanges PASS 424/424 exchanges carry a distribution (100 %); the others enter the Monte Carlo as fixed values
Monte Carlo 95 % interval contains the deterministic score PASS 0.1084 in [0.1001, 0.1391]
time period declared PASS 2023/2023
geography is a known location code PASS EE
sources cited PASS 2 reference(s), of which 1 dataset source(s); 0 resolved to a bibliographic record (DOI or Crossref/OpenAlex match), the others kept as the publisher declares them

References

  1. Oberschelp C. (2025) 2025 - Electricity mixes in UVEK database - Oberschelp. Oberschelp Consulting — published source; as declared by BAFU (not found in OpenAlex/Crossref)
  2. Life Cycle Inventory database of the Swiss Federal Administration, BAFU:2026 — database; dataset citation
  3. International Organization for Standardization (2006). ISO 14044:2006 Environmental management — Life cycle assessment — Requirements and guidelines (incl. Amd 1:2017, Amd 2:2020). Geneva.
  4. Frischknecht R. (2023). FOEN LCI data — Data quality requirements (DQR) v2.1. treeze Ltd. on behalf of the Swiss Federal Office for the Environment (FOEN/BAFU), Uster / Bern. (tdc-doc method reference; title, version and year to verify against the user's copy)
  5. European Commission, Joint Research Centre (2022). Environmental Footprint (EF) reference package 3.1. Ispra.
  6. Mutel C. (2017). Brightway: An open source framework for Life Cycle Assessment. Journal of Open Source Software 2(12), 236. https://doi.org/10.21105/joss.00236

Annex — licence and terms of use

BAFU:2026 Terms of Use - free use, processing and reuse of the data (including in LCA studies and calculators); the data may not be sold, resold or distributed as a database; modifications must be documented and shared under equivalent terms; credit required.


To suggest a correction or a dataset that does not exist yet, use Propose a dataset.

datasets/bafu/c63ddb05-f428-3c9a-b1c0-6fffba482599.txt · Last modified: by 127.0.0.1

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki